ATE Transmissora de Energia
The company was established as of the concession, to Abengoa, of Lot A in the ANEEL 001/2003
Auction. The ATE is a Public Service Energy Transmission Concessionaire (a SIN Agent -
Sistema Interligado Nacional [National Interconnected System]).
The System includes two, 525 kV, simple circuit Transmission Lines.
Starting in Londrina (PR) and ending in Assis (SP), Circuit 1, with an approximate extension
of 120 km and 245 towers. Starting in Assis (SP) and ending in Araraquara (SP), Circuit 1, with an
approximate distance of 250 km and 490 towers.
Locations:
Substation Londrina/ELETROSUL:
Highway BR 445, km 360.
District of Irerê
Londrina – PR
Substation Assis/CTEEP:
Highway Raposo Tavares km 438.
Assis - SP
Substation Araraquara
Highway Washington Luiz, km 280.66 (Substation Araraquara)
Lageado District
Araraquara-SP
Started operations on February 18, 2006.
|