The largest job and career event ever held in Rio de Janeiro
The project is part of PEyC in Brazil
The initiative will promote the training of skilled labor
The company gave a conference about Integrated Solar Combined Cycle (ISCC) plants.
Own staff gives competitive advantage to the company
The event marks another stage of PEyC Project in Brazil
The planning has generated savings of approximately 474 thousand dólares
The company will receive €90 million from the sale, which will be used to develop new projects in the country.
A leading initiative qualifies Substation Maintenance Technicians to work also in operations.
The Company goes after getting Norm SA 8000 Certification.
Santa Rita de Cássia Orphanage is the benefited institution.
The subsidiary of the Spanish company will detain up to 50,01 % of the engineering company capital within three years.
Construction to Start This Year.
This measure opens ways for new business.
Solidarity made the difference for those who had lost everything in the catastrophe which reached the state.
Sustainable agriculture engages local producers.
Works of environmental awareness and social inclusion developed by the company are praised by government authorities.
The transmission lines Campos Novos - Videira, state of Santa Catarina, and Cascavel Oeste - Foz do Iguaçu Norte, Paraná, both in the south of the country, are already in operation and mark a new stage in Abengoa Brazil, which will make...
Gabriel Pisarello was born in Corrientes on the 7th of November, 1950. He is married with Mirta Almeyda and he has 2 children. Nowadays, they live in Brasilia...
The contract includes the construction of associated facilities and its subsequent operation and maintenance.
Abengoa Brasil was recommended for the Certification of its Integrated Management System based on standardization patterns ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007.
Abengoa Brasil, as a participant of Consórcio Norte Brasil, signs the Concession Contract of the Transmission System of Rio Madeira.
The project was the result of a public auction held by ANEEL – Agência Nacional de Energia Elétrica – [National Agency of Electric Energy], Invitation to Bid number Nº 001/2005 Lot A.
The Abengoa Brasil Transmission System Control Center (COS) started operations on July 1st.
The new centralized operating system remotely controls all the Abengoa Brasil concessionaires and is located in Rio de Janeiro.